Rotating Equipment Alignment

  • Rotating Equipment Alignment

Programs

Start Date
December 9, 2025
Duration
24 Hours

The name of different rotating equipment in the plant and their functions (an overview)

  1. Pumps
  • What is the function of the pump in the plant?
  • Classification of pumps
  • The working principle of each type and its basic components
  • The required inspection before start up, during normal running condition, and after shutdown
  • The required steps to prepare the pump for starting up (pump priming), and how to regulate the flow rate
  • The required information which should be given to the pump manufacture to supply the correct pump for specific application
  1. Compressors
  • What is the function of the compressor in the plant?
  • Classification of compressors (positive displacement and dynamic compressors)
  • The working principle of each type of compressors and its basic components
  • Multi-staging in compressors
  • Compressor cooling system, intercoolers, and after coolers
  • The required inspection before start up, during normal running condition, and after shutdown
  • The required steps to prepare the compressor for starting up, and how to regulate the flow rate in each type of these compressors
  • The required information which should be given to the compressor manufacture to supply the correct compressor for specific application
  1. Internal combustion engines
  • What is the function of internal combustion engines in the plant?
  • Classification of internal combustion engines with respect to the fuel, cooling system, and cylinder lay out
  • The working principle of each type and its basic components
  • Engine supporting systems (fuel system, lubrication system, air intake and turbo-charger system, starting system, and cooling system)
  • The required inspection before starting up the engine, during normal running condition, and after shutdown
  • The required information which should be given to the internal combustion engine manufacture to supply the correct engine for specific application
  1. Gas turbines
  • What is the function of gas turbine in the plant? Application considerations
  • How it works? And the turbine basic components
  • Gas turbine supporting systems (Fuel system, Oil lubrication system, air intake system, starting system, and speed control system).
  • Classification of gas turbine into single shaft and double shafts designs
  • Gas turbine starting up sequence (pre-start inspection)
  • Required checks during normal running
  • Required checks after shut down the turbine
  • Compressor cleaning
  • The required information which should be given to the gas turbine manufacture to supply the correct gas turbine for specific application
  1. Steam turbines
  • What is the function of steam turbine in the plant? Application considerations
  • How it works? And the turbine basic components
  • Steam turbine supporting systems (steam supply and control, Oil lubrication system, and speed control system).
  • Required checks during normal running
  • Required checks after shut down the turbine
  • The required information which should be given to the steam turbine manufacture to supply the correct steam turbine for specific application
  1. Turbo expanders
  • The function of turbo expanders in the plant, the working principle, and the turbo expander components
  • Selection of turbo expanders for particular application: factors affect the selection
  • Turbo expander operational problems, and turbo expander maintenance
  • The required information to order and select proper turbo expander for specific application
  1. Gear boxes and power transmission systems
  • The function of gear box in the plant, the working principle, different types of gears and the gear box components
  • Selection of gear box for particular application: factors affect the selection
  • Gear box operational problems, and gear box maintenance
  • The required information to order and select proper gear box for specific application

Who can benefit (who should attend)?

This is an essential course for new engineers / technicians who are involved with rotating equipment in the plant and also for technicians (the existing staff) as refreshing course.

Suggested Programs

Productivity Planning and Improvement
12/04/2025
16 Hours
  • Engineering
  • Quality & Safety
Scroll to Top